Sign In | Join Free | My chinacsw.com |
|
Brand Name : Daoyi Chemistry
Model Number : granules
Certification : SGS and IAAF Certified
Place of Origin : Ningbo, Zhejiang, China
MOQ : 1 ton
Price : negotiated
Payment Terms : L/C, T/T
Supply Ability : 12000 tons per month
Delivery Time : 5 working days
Packaging Details : 25 kg per bag
brand : Daoyi Chemistry
Hardness Shore A : 60A±2A
Density : 1.05-1.15
Size : granules
Tensile strength : 4-20
Tear strength : 20-68
Product Description
Excellent physical and chemical properties of our granules create comfortable conditions for professional sporting. Flexible material with specified parameters makes the running tracks and football fields springy and supports dynamic and smooth movements.Top layers dedicated to different sport disciplines have suitable anti-slippery properties. In particular, the granules are usedto build professional athletic race tracks in stadiums and to fill artificial turf for football grounds as well as for tennis court surface.
Technical data sheet
Descripion | Artificial Grass Rubber Granules |
Color | green and other colors |
Items | Unit | Test Results |
Tensile Strength | MPA | 4-20 |
Density | g/cm³ | 1.05-1.15 |
Hardness Shore A | ShoreA | 60A±2A |
Tensile Elongation @Brk | % | 300-780 |
Tear strength | KN/m | 20-68 |
Artificial grass installation
1.Prepare and test the base ground:Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes, making sure the foundation is qualified for installing artificial grass.
2.Measuring line:Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition.
3.Palletising turf roll:According to drawing, position the turf rolls on the exact places along the touchline.
4.Cutting the edge:Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for installation.
5.Cutting white line:Measure and re-position the white line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts.
6.Infill rubber granules:After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.
7.Brushing: to brush the grass in the vertical and horizontal one time by the grass-brushing machine
8.Check and Acceptance:Inspect the entire finished lawn as per concerned standards and requirement. If any defects found, correct it.
Product picture
![]() |
Anti Slip Artificial Turf Rubber Pellets Images |